ARTICLE AD BOX
Published June 02, 2026 | 06:40 PM

FAISALABAD, (APP - UrduPoint / Pakistan Point News - 2nd Jun, 2026) Water and Sanitation Agency (WASA) Managing Director Saqib Raza has directed to complete the de-silting of all main channels by June 15, clarifying that the de-silting campaign should be further accelerated to achieve the set target.
<?php /*?> <?php */?>He said that a special campaign for de-silting of all main channels and roadside drains is going on to provide quality drainage services to the citizens during the monsoon season.
He further said that at present, the de-silting campaign of main channels has been speeded up and the drainage staff has been warned that the set target of de-silting of main channels by the stipulated time frame must be achieved.
He clarified that all machinery regarding de-silting should be kept operational and the de-silting process should continue as per the issued schedule adding that the report of which must be provided on a daily basis.
.png)
3 days ago
2






English (US) ·